C12 Marine Engines Vibration Damper and Pulley - Remove and Install Caterpillar


Vibration Damper and Pulley - Remove and Install
`
C12 Marine Engines [RENR9405]
BASIC ENGINE
DAMPER GP
C12 Marine Engines Vibration Damper and Pulley - Remove and Install
1.1. Removal Procedure
2.1. Installation Procedure

Removal Procedure

Table 1
Required Tools 
Tool  Part Number  Part Description  Qty 
439-3938  Link Bracket 

  1. Remove the belt guard.


    Illustration 1g01107224

  2. Remove V-belt (2).

  3. Remove bolt (3) and install Tooling (A).

  4. Attach a suitable lifting device to Tooling (A). The weight of the vibration damper and pulley is approximately 27 kg (60 lb).

  5. Remove bolts (4).

  6. Remove the vibration damper and pulley (1).

Installation Procedure

Table 2
Required Tools 
Tool  Part Number  Part Description  Qty 
439-3938  Link Bracket 


    Illustration 2g01107224

  1. Attach Tooling (A) and a suitable lifting device to the vibration damper and pulley (1). The weight of the vibration damper and pulley is approximately 27 kg (60 lb).

  2. Install the vibration damper and pulley (1).

  3. Install bolts (4). Tighten all bolts evenly to a torque of 300 ± 40 N·m (221 ± 30 lb ft).

  4. Remove Tooling (A) and install bolt (3).

  5. Install V-belt (2).

  6. Install the belt guard.