Maintenance Interval Schedule - 3054 Naturally Aspirated Marine Generator Set Engine
`
3054 and 3056 Marine Generator Sets
[SEBU7577]
3054 and 3056 Marine Generator Sets
Safety Messages
3054 and 3056 Marine Generator Sets
Maintenance Interval Schedule - 3054 Turbocharged Marine Generator Set Engine
ENGINE ARRANGEMENT
Note: Before performing any operation or maintenance procedures, ensure that the Safety Information, warnings, and instructions are read and understood.
To determine the maintenance intervals, use fuel consumption, service hours, or calendar time, whichever occurs first . Experience has shown that maintenance intervals are most accurately scheduled on the basis of fuel consumption.
Before each consecutive interval is performed, all of the maintenance items from the previous interval must also be performed.
When Required
Battery - ReplaceBattery or Battery Cable - Disconnect
Engine - Clean
Fuel System - Prime
Generator Set - Test
Rotating Rectifier - Test
Daily
Cooling System Coolant Level - CheckElectrical Connections - Check
Engine Air Cleaner Service Indicator - Inspect
Engine Oil Level - Check
Generator Load - Check
Walk-Around Inspection
Every Week
Generator - InspectEvery 100 Service Hours or 3 Months
Insulation - TestEvery 500 Service Hours
Cooling System Coolant Sample (Level 1) - ObtainEvery Year
Cooling System Coolant Sample (Level 2) - ObtainFirst 300 L (80 US gal) of Fuel or First 20 to 40 Service Hours
Belts - Inspect/Adjust/Replace
Engine Valve Lash - Inspect/Adjust
Every 3000 L (800 US gal) of Fuel or 400 Service Hours or 1 Year
Auxiliary Water Pump (Rubber Impeller) - Inspect
Battery Electrolyte Level - Check
Cooling System Supplemental Coolant Additive (SCA) - Test/Add
Crankshaft Vibration Damper - Inspect
Engine Air Cleaner Element (Dual Element) - Clean/Replace
Engine Mounts - Inspect
Engine Oil Sample - Obtain
Engine Oil and Filter - Change
Fuel System Primary Filter (Water Separator) Element - Replace
Fuel System Secondary Filter - Replace
Fuel Tank Water and Sediment - Drain
Fuel Transfer Pump Strainer - Clean
Heat Exchanger - Inspect
Hoses and Clamps - Inspect/Replace
Every 45 000 L (12 000 US gal) of Fuel or 6000 Service Hours
Cooling System Coolant (ELC) - Change
Every 7500 L (2000 US gal) of Fuel or 1000 Service Hours
Engine Valve Lash - Inspect/Adjust
Rotating Rectifier - Check
Every 15 000 L (4000 US gal) of Fuel or 2000 Service Hours or 2 Years
Alternator - Inspect
Cooling System Coolant (DEAC) - Change
Cooling System Water Temperature Regulator - Replace
Engine Crankcase Breather - Clean/Replace
Fuel Injection Nozzles - Test/Exchange
Generator - Dry
Starting Motor - Inspect
Turbocharger - Inspect/Clean
Water Pump - Inspect
Every 75 000 L (20 000 US gal) of Fuel or 10 000 Service Hours
Overhaul Considerations
Every 22 800 L (6000 US gal) of Fuel or 3000 Service Hours
Cooling System Coolant Extender (ELC) - Add
Information System:
120M, 12M, 140, 140M, 150, 14M, 160M, 160 and 16M Motor Graders Secondary Steering System
Introduction
Cat</SUP> Digital Voltage Regulator
Parameter Viewing and Configuration (Caterpillar Electronic Technician)
12M, 140, 140M, 150, 160M and 160 Motor Graders Hydraulic and Steering System
Hydraulic and Steering System
C12 Marine Engines
Crankshaft Gear - Remove and Install
C12 Marine Engines
Crankshaft - Install
C9 Industrial Engines
Electric Starting Motor
12M, 140, 140M and 160M Motor Graders Braking and Hydraulic Fan System
Brake Accumulator
C12 Marine Engines
Crankshaft - Remove
C12 Marine Engines
Crankshaft Main Bearings - Install
C11 and C13 Engines for Caterpillar Built Machines
Can Not Reach Top Engine RPM
C12 Marine Engines
Crankshaft Main Bearings - Remove
C12 Marine Engines
Connecting Rod Bearings - Install
C12 Marine Engines
Electric Starting Motor - Remove and Install
EMCP3
System Operation
C12 Marine Engines
Lifter Group - Remove and Install
120M, 12M, 140, 140M, 150, 14M, 160M, 160 and 16M Motor Graders Secondary Steering System
Location of Hydraulic Components
C6.6 Marine Generator Set EMCP3
General Information
C12 Marine Engines
Engine Oil Filter Base - Disassemble
C12 Marine Engines
Engine Oil Filter Base - Assemble
C12 Marine Engines
Heat Exchanger - Remove
Field Installation of the 263-8162 Sleeve Kit (INJECTOR){1713}
C12 Marine Engines
Cylinder Head - Remove
C12 Marine Engines
Cylinder Head - Install
120M, 12M, 140, 140M, 150, 14M, 160M, 160 and 16M Motor Graders Secondary Steering System
Secondary Steering System